Difference between revisions of "FY2022 beam test low rate summary"

From solidwiki
Jump to: navigation, search
(Test Condition)
(Run Information)
Line 6: Line 6:
  
 
==Run Information==
 
==Run Information==
 +
*Detector calibration:
 +
**Most scintillators and Preshower show MIP and some double-MIP structure
 +
**At this large (82 deg) angle, pions would not leave MIP in the Shower
 +
**For Shower modules, only electrons deposit large amount of energy and we managed to compare data with simulation and use the histogram slope at high energy side for calibration purposes
 +
**Some mixed up of Shower HV for part of the run period that caused the 3 shower blocks to be grossly mismatched.
 
*Jixie's [https://redmine.jlab.org/projects/solid-ecal/wiki/Hallc_beamtest_runlist online run list] on redmine
 
*Jixie's [https://redmine.jlab.org/projects/solid-ecal/wiki/Hallc_beamtest_runlist online run list] on redmine
 
*Jixie's [https://redmine.jlab.org/projects/solid-ecal/wiki/Cable_map_(signal_&_HV) cable and HV map] on redmine
 
*Jixie's [https://redmine.jlab.org/projects/solid-ecal/wiki/Cable_map_(signal_&_HV) cable and HV map] on redmine

Revision as of 20:56, 19 May 2023

Goals

  • Detector and system checkout

Test Condition

  • The detector stand was located at 82 deg beam-left.

Run Information

  • Detector calibration:
    • Most scintillators and Preshower show MIP and some double-MIP structure
    • At this large (82 deg) angle, pions would not leave MIP in the Shower
    • For Shower modules, only electrons deposit large amount of energy and we managed to compare data with simulation and use the histogram slope at high energy side for calibration purposes
    • Some mixed up of Shower HV for part of the run period that caused the 3 shower blocks to be grossly mismatched.
  • Jixie's online run list on redmine
  • Jixie's cable and HV map on redmine