Difference between revisions of "SoLID Ecal Weekly 20230818"

From solidwiki
Jump to: navigation, search
(Created page with "=Rate discussion= *Mike's slides *Ye's slides =SPD timing= *Carter's slides *need to add C-D data, perhaps check the timing propagation")
 
(Rate discussion)
 
(11 intermediate revisions by 4 users not shown)
Line 1: Line 1:
 
=Rate discussion=
 
=Rate discussion=
*Mike's slides
+
*Mike's slides on MIP shift (integral): [https://solid.jlab.org/wiki/images/6/67/High_Rate_08_17.pdf 08_17]
*Ye's slides
+
*Ye's slides [https://solid.jlab.org/wiki/images/e/ec/081720223_beamtest_update.pdf] on MIP and baseline shift (height), and expected rate of low-energy background in ECal from beam-on-target simulation
 +
*suggest for the MIP shift study:
 +
**Ye can apply beam current cut to get baseline (from "before pulse" window) for intermediate beam current values;
 +
**decompose MIP shift as sum of baseline shift and PMT gain shift. To do so, we need a few plots clearly indicating each component:
 +
#plot total MIP peak integral vs beam current (Mike already has this)
 +
#use 2D peak integral vs. peak height plot, extract a "time factor", let's call it t_trig
 +
#plot baseline vs beam current (Ye already has this but need more current values), expect an exp() function
 +
#multiply baseline (minus pedestal) with "t_trig" then times two (2), plot this vs. beam current; expect an exp() function
 +
#plot MIP height (minus baseline) vs. beam current
 +
#multiply MIP height (minus baseline) from above with t_trig, plot this vs. beam current
 +
#add 4 and 6 from above, do they agree with 1?
 +
#check how much horizontal scaling is needed for the Shower histogram to match the 5 uA run (from Ye)
 +
#does the scaling from 8 resembles the inverse of the values from 3 above? (make a comparison or plot)
 +
#If possible, plot all above vs. background rate instead of beam current (but only if we have a reliable way to get the rate).
 +
 
 +
*suggest for rate comparison with beam-on-target simulation:
 +
#Can we add a tiny Edep cut, rather than greater than zero?
 +
#Can we possibly get this from random trigger FADC raw signals?
  
 
=SPD timing=
 
=SPD timing=
*Carter's slides
+
*[https://solid.jlab.org/wiki/images/0/02/Carter_08182023.pdf Carter's slides]
 
*need to add C-D data, perhaps check the timing propagation
 
*need to add C-D data, perhaps check the timing propagation

Latest revision as of 00:01, 1 September 2023

Rate discussion

  • Mike's slides on MIP shift (integral): 08_17
  • Ye's slides [1] on MIP and baseline shift (height), and expected rate of low-energy background in ECal from beam-on-target simulation
  • suggest for the MIP shift study:
    • Ye can apply beam current cut to get baseline (from "before pulse" window) for intermediate beam current values;
    • decompose MIP shift as sum of baseline shift and PMT gain shift. To do so, we need a few plots clearly indicating each component:
  1. plot total MIP peak integral vs beam current (Mike already has this)
  2. use 2D peak integral vs. peak height plot, extract a "time factor", let's call it t_trig
  3. plot baseline vs beam current (Ye already has this but need more current values), expect an exp() function
  4. multiply baseline (minus pedestal) with "t_trig" then times two (2), plot this vs. beam current; expect an exp() function
  5. plot MIP height (minus baseline) vs. beam current
  6. multiply MIP height (minus baseline) from above with t_trig, plot this vs. beam current
  7. add 4 and 6 from above, do they agree with 1?
  8. check how much horizontal scaling is needed for the Shower histogram to match the 5 uA run (from Ye)
  9. does the scaling from 8 resembles the inverse of the values from 3 above? (make a comparison or plot)
  10. If possible, plot all above vs. background rate instead of beam current (but only if we have a reliable way to get the rate).
  • suggest for rate comparison with beam-on-target simulation:
  1. Can we add a tiny Edep cut, rather than greater than zero?
  2. Can we possibly get this from random trigger FADC raw signals?

SPD timing