Difference between revisions of "SoLID Ecal Weekly 20231005"

From solidwiki
Jump to: navigation, search
(Update on MIP study)
(Pion rejection study)
Line 7: Line 7:
 
**SC_A & SC_D trigger efficiency is very low at ~3%, in order to get pion dominant samples, we need to apply Shower_{i}/ShowerSum>0.8+ 200 ADC<preshower<500 ADC cuts.
 
**SC_A & SC_D trigger efficiency is very low at ~3%, in order to get pion dominant samples, we need to apply Shower_{i}/ShowerSum>0.8+ 200 ADC<preshower<500 ADC cuts.
 
==Pion rejection study==
 
==Pion rejection study==
Mike slides
+
Mike's slides

Revision as of 09:01, 6 October 2023

Update on MIP study

Ye's slides [1]

  • To clean up the MIP data sample:
    • Baseline shift correction
    • Gain shift correction (based on MIP height)
    • Fix 40ns as the integral TW in the decoder
    • SC_A & SC_D trigger efficiency is very low at ~3%, in order to get pion dominant samples, we need to apply Shower_{i}/ShowerSum>0.8+ 200 ADC<preshower<500 ADC cuts.

Pion rejection study

Mike's slides