Difference between revisions of "SoLID Ecal Weekly 20231005"

From solidwiki
Jump to: navigation, search
(Update on MIP study)
(Update on MIP study)
Line 1: Line 1:
 
=Update on MIP study=
 
=Update on MIP study=
 
Ye's slides[https://solid.jlab.org/wiki/images/b/b2/10052023_beamtest_update.pdf ]
 
Ye's slides[https://solid.jlab.org/wiki/images/b/b2/10052023_beamtest_update.pdf ]
 +
*To clean up the MIP data sample:
 +
**Baseline shift correction
 +
**Gain shift correction (based on MIP height)
 +
**fix 40ns integral TW in the decoder
 +
**SC_A & SC_D trigger efficiency is very low at ~3%, in order to get pion dominant samples, we need to apply Shower_{i}/ShowerSum>0.8+ 200 ADC<preshower<500 ADC cuts.

Revision as of 09:00, 6 October 2023

Update on MIP study

Ye's slides[1]

  • To clean up the MIP data sample:
    • Baseline shift correction
    • Gain shift correction (based on MIP height)
    • fix 40ns integral TW in the decoder
    • SC_A & SC_D trigger efficiency is very low at ~3%, in order to get pion dominant samples, we need to apply Shower_{i}/ShowerSum>0.8+ 200 ADC<preshower<500 ADC cuts.