Difference between revisions of "SoLID Ecal Weekly 20231005"
From solidwiki
(→Update on MIP study) |
(→Update on MIP study) |
||
Line 4: | Line 4: | ||
**Baseline shift correction | **Baseline shift correction | ||
**Gain shift correction (based on MIP height) | **Gain shift correction (based on MIP height) | ||
− | ** | + | **Fix 40ns as the integral TW in the decoder |
**SC_A & SC_D trigger efficiency is very low at ~3%, in order to get pion dominant samples, we need to apply Shower_{i}/ShowerSum>0.8+ 200 ADC<preshower<500 ADC cuts. | **SC_A & SC_D trigger efficiency is very low at ~3%, in order to get pion dominant samples, we need to apply Shower_{i}/ShowerSum>0.8+ 200 ADC<preshower<500 ADC cuts. |
Revision as of 09:00, 6 October 2023
Update on MIP study
Ye's slides[1]
- To clean up the MIP data sample:
- Baseline shift correction
- Gain shift correction (based on MIP height)
- Fix 40ns as the integral TW in the decoder
- SC_A & SC_D trigger efficiency is very low at ~3%, in order to get pion dominant samples, we need to apply Shower_{i}/ShowerSum>0.8+ 200 ADC<preshower<500 ADC cuts.