SoLID Ecal Weekly 20231005

From solidwiki
Revision as of 09:00, 6 October 2023 by Tianye (Talk | contribs) (Update on MIP study)

Jump to: navigation, search

Update on MIP study

Ye's slides[1]

  • To clean up the MIP data sample:
    • Baseline shift correction
    • Gain shift correction (based on MIP height)
    • Fix 40ns as the integral TW in the decoder
    • SC_A & SC_D trigger efficiency is very low at ~3%, in order to get pion dominant samples, we need to apply Shower_{i}/ShowerSum>0.8+ 200 ADC<preshower<500 ADC cuts.