Weekly : Monday, Feb.6, 2017 9:30am EDT

From solidwiki
Revision as of 20:02, 3 December 2020 by Saw (Talk | contribs) (Created 02/03/17(Tianye), Last modified 02/06/17(Tianye))

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Agenda

Present:
Paul, JP, Seamus, Ole, Chao, Ye, Zhihong, Zhiwen, Nilange

Minutes

  • Summarized the review text in 5 pages plus appendix
    • Paul and JP will send Zhiwen their drafts
  • The dimensions of the designed sub-detectors need to be finalized in the Collaboration meeting on March 5-6
    • The regular Monday meeting in two weeks from now will discuss the starting point of increasing space of sub-detectors (few cm--20cm--44cm?)
    • The target position is fixed and the baffle system is not changed.