|
|
Line 1: |
Line 1: |
− | Link to the Meeting page [[Meeting solid]] <br/>
| |
− | Last meeting: [[SoLID Weekly : Monday, February 8, 2016 9:30am EDT]]
| |
| | | |
− | The teleconference info is as follows:
| |
− |
| |
− | Phone #: +1-888-240-2560 or +1-408-740-7256 and [http://bluejeans.com/numbers See International Numbers]
| |
− | Code: 8540081197
| |
− | Computer : [https://bluejeans.com/8540081197 blujeans-browser]
| |
− | Date and Location: Weekly Monday at 9:30AM in CEBAF center F226 (announcement in solid emaillist)
| |
− |
| |
− | == Agenda ==
| |
− | * List of simulation goals
| |
− | <pre>
| |
− | Complete the PVDIS ECAL Trigger Study with new backgrounds - Rakitha (Finish before end of February 2016)
| |
− | Obtain the ECAL trigger rates
| |
− | Obtain the ECAL trigger curves
| |
− | Complete the PVDIS Cerenkov Trigger Study with new backgrounds - Rakitha, Zhiwen, Micheal
| |
− | Can Micheal re-do previous Cerenkov trigger study with new backgrounds? (Finish before end of February 2016)
| |
− | Otherwise implement the Cerenkov in GEMC correctly and complete the study (Finish by Summer 2016)
| |
− | If Micheal can repeat his Cerenkov analysis, then using singles trigger rates from ECAL and Cerenkov regenerate the pre-CDR trigger tables - Rakitha (Finish before end of February 2016)
| |
− | Implement the SIDIS ECAL (large and forward angles) in new new GEMC framework based simulation - Rakitha (Finish by Summer 2016)
| |
− | Obtain the ECAL trigger rates
| |
− | Obtain the ECAL trigger curves
| |
− | Implement ECAL in the new GEMC framework based simulation - Rakitha, Zhiwen
| |
− | To do PVDIS Cerenkov + ECAL trigger study
| |
− | Excess Pion production in Geant4 - Rakitha (Finish by end of 2016)
| |
− |
| |
− | </pre>
| |
− |
| |
− |
| |
− |
| |
− | Present:<br/>
| |
− | Rakitha, Alex, Paul, Vince, Seamus, Lorenzo, Zhihong, Rich
| |
− | == Minutes ==
| |
− | * Addressing comments from JLab management about the funding supplemental documents
| |
− | **
| |
− |
| |
− | == Misc.==
| |