FY2022 beam test winter break summary

From solidwiki
Jump to: navigation, search

Configuration changes during winter break

  • Detector configuration change
    • FASPD was taken out (it was not producing signal)
    • two more GEM chambers were added
    • shielding was added in front of the first GEM chamber
    • new scintillators were added or replaced
  • DAQ and readout system
    • Summing modules were added that allowed triggering on Shower Sum
    • Amplifiers (x10) were added to many of the scintillator channels (CHerenkov already had amplifiers during low rate run)
    • Discriminator thresholds are now remotely controlled