FY2022 beam test winter break summary
From solidwiki
Configuration changes during winter break
- Detector configuration change
- FASPD was taken out (it was not producing signal)
- two more GEM chambers were added
- shielding was added in front of the first GEM chamber
- new scintillators were added or replaced
- DAQ and readout system
- Summing modules were added that allowed triggering on Shower Sum
- Amplifiers (x10) were added to many of the scintillator channels (CHerenkov already had amplifiers during low rate run)
- Discriminator thresholds are now remotely controlled