SoLID Ecal Weekly 20230615

From solidwiki
Jump to: navigation, search

Update from Darren/Spencer

  • AI/ML PID - SULI Week 2
    • Trying new ML architecture
    • Preliminary Signal-Background merging
  • Sim-Data Comparison
    • Scaling ShowerSum for simulation by MIP peak with Gaussian smearing then scaling vertically by rate
    • Vertical scaling ShowerSum for data using runtime (questions remain)

Update from Mike

  • Spoke with Xinzhan (who is still at Fermi Lab). The offsets he determined have not been included in the current replay.

Update on Edge Finding

  • Carter is continuing to work on the edge finding. Algorithm seems to be working out but some issues applying to the LASPD
  • Jixie commented that LASPD signal does not go through the 10x Amplifier, so do not expect it to be the same size


Deconvolution

  • Jixie discussed update on deconvolution algorithm. It currently works for the Ecal but not the scintillators