Revision history of "FY2022 beam test winter break summary"

Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 21:02, 19 May 2023Xiaochao (Talk | contribs). . (531 bytes) (+531). . (Created page with "=Configuration changes during winter break= *Detector configuration change **FASPD was taken out (it was not producing signal) **two more GEM chambers were added **shielding...")