Difference between revisions of "SoLID Ecal Weekly 20230615"
From solidwiki
(Created page with "==Update from Darren/Spencer== * AI/ML PID - [https://solid.jlab.org/wiki/index.php/File:SULI_Week2_ML_PID.pdf SULI Week 2] ** Trying new ML architecture ** Preliminary Signa...") |
(→Update from Others) |
||
Line 11: | Line 11: | ||
− | ==Update | + | ==Update on Edge Finding== |
− | * | + | * Carter is continuing to work on the edge finding. Algorithm seems to be working out but some issues applying to the LASPD |
+ | * Jixie commented that LASPD signal does not go through the 10x Amplifier, so do not expect it to be the same size |
Revision as of 09:26, 20 June 2023
Update from Darren/Spencer
- AI/ML PID - SULI Week 2
- Trying new ML architecture
- Preliminary Signal-Background merging
- Sim-Data Comparison
- Scaling ShowerSum for simulation by MIP peak with Gaussian smearing then scaling vertically by rate
- Vertical scaling ShowerSum for data using runtime (questions remain)
Update from Mike
- Projecting to target using GEM
Update on Edge Finding
- Carter is continuing to work on the edge finding. Algorithm seems to be working out but some issues applying to the LASPD
- Jixie commented that LASPD signal does not go through the 10x Amplifier, so do not expect it to be the same size