Search results
Create the page "Jixie" on this wiki! See also the search results found.
- ...rweb.jlab.org/~jixie/proposal/JixieZhang-Dihadron-SoLID-May2013.pdf pdf] Jixie Zhang5 KB (629 words) - 15:46, 3 December 2020
- ...eeting_coll/2014_07/Jixie-Dihadron-July2014.pdf pdf] || Jixie Zhang7 KB (726 words) - 15:46, 3 December 2020
- ...ch are needed to compile the "bggen" on current ifarm machine. Basically, Jixie commanded out all the HallD tracking software "HDDM", which are not needed ...and recompile the code. The more user friendly version is under working by Jixie.18 KB (2,687 words) - 16:53, 5 April 2025
- ...sistency of check halld based generator rate with nuclei target (Ye Tian, Jixie, Rakitha) (done)13 KB (1,710 words) - 20:17, 7 February 2022
- **check Jixie's timing database, LASPD timing is good! *Jixie is working on pulse deconvolution. Will do all detectors and include the pr2 KB (407 words) - 11:40, 19 May 2023
- *Jixie's online run list on redmine: [https://redmine.jlab.org/projects/solid-ecal *Jixie's [https://redmine.jlab.org/projects/solid-ecal/wiki/Cable_map_(signal_&_HV4 KB (575 words) - 13:42, 12 August 2024
- ...this is already shifted at the software level when doing the peak-finding, Jixie will pass on information on how to read this timing shift from the database *Jixie: pulse deconvolution works for ECal but not other detectors because the pul2 KB (360 words) - 11:22, 19 May 2023
- ...ShowerSum, but Ye only plotting Shower-Top, would that make a difference? Jixie: Showers are aligned within 2 windows (8ns) *Jixie did another round of 18 deg data, next will be after GEM tracking is fully6 KB (944 words) - 11:04, 19 May 2023
- *Yesterday (Wednesday March 29th), moving cables out of the way (Mike, Jimmy, Jixie), cleaned up, preparing labels for UVA property; Could move stuff to ESB. *Cooking (Jixie): Note that some runs were cooked incorrectly (see Monday note). It was fou2 KB (320 words) - 10:57, 19 May 2023
- *Jixie's [https://redmine.jlab.org/projects/solid-ecal/wiki/Hallc_beamtest_runlist *Jixie's [https://redmine.jlab.org/projects/solid-ecal/wiki/Cable_map_(signal_&_HV1 KB (172 words) - 20:59, 19 May 2023
- *pulse deconvolution -- Jixie started from Hall A code and adapted it to our decoder. So far it works for ...will look into it and "grab" the code. Jixie could then implement. (Note: Jixie's peak finding code already has start/max/end time of the peak but this is5 KB (813 words) - 10:56, 21 September 2023
- **(Jixie, W. Gu): CODA3.0 uses power(2,n-1)+1, so n=6 means 33 and for every 33 even4 KB (587 words) - 10:15, 21 September 2023
- * Jixie commented that LASPD signal does not go through the 10x Amplifier, so do no * Jixie discussed update on deconvolution algorithm. It currently works for the Eca934 bytes (145 words) - 09:28, 20 June 2023
- ==Update from Jixie==930 bytes (145 words) - 18:41, 24 June 2023
- ==Update from Jixie==2 KB (346 words) - 15:53, 6 July 2023
- * Suggest reading through Jixie's work on LASPD timing from cosmic test, latest one reported on [https://ha3 KB (495 words) - 13:30, 1 August 2023
- **Mike will check with Jixie on the code and technical note availability. The note should contains the 2 *Jixie's pedestal study (on redmine) is without beam. Checking the run plan, it lo5 KB (788 words) - 10:46, 1 August 2023
- **check if Jixie did any pedestal study -- update: all studies were done with beam off, HV o1,009 bytes (162 words) - 09:37, 31 July 2023